The whole day is made for a large screen. Open the page on a computer or a large display.
The staff have their morning meeting.
The production manager creates the day's tasks.
Theryn sends the tasks to each employee.
Joint debrief.
The production manager sees everything registered today.
Operator
Production manager
Veterinarian
Biologist
Management
Analyst
The operator feeds the fish in tank 4 and scores how their appetite looks.
The operator checks the oxygen and pH sensors in tank 4.
The operator weighs a sample of the fish in tank 4 for their average weight.
The production manager goes through the dashboard for the production hall: oxygen, TGP, redox and pH.
The production manager opens the biomass overview.
The production manager gets the vet's report and the biologist's to-do from Theryn.
The production manager asks “Ask” whether the low oxygen saturation hangs together with what the vet found.
The production manager publishes the updated production plan.
The production manager creates a deviation for low oxygen saturation in tank 4.
The vet checks the health and gill covers of a sample of fish from tank 4.
The vet checks the oxygen data for tank 4.
The vet writes a report on the scoring and the oxygen finding.
Water qualityDepartment 1 · last 30 daysAlkalinity · 104 mg/LTAN · 0.7 mg/L52 mg/LUnusual · 1.8 mg/L
To-do · tomorrowSave
The biologist takes manual readings of the water quality in the biofilter in department 1.
The biologist looks at the water quality over the last 30 days.
The biologist writes the action into the to-do list for tomorrow.
KPIsMonth to date · against budgetBiomass486 tBudget 497 tFCR1.06Budget 1.00SGR1.44 %Budget 1.50 %Mortality0.61 %Budget 0.50 %
Deviation reportFrom the production managerLow oxygen saturation · Tank 4Vet's report213ActionsMore oxygen addedApprovedReduced feedingApproved
Plan and forecastFrom the production managerToday−37 tBiomass583 tBudget 620 tToday−116 tHarvest1,334 tBudget 1,450 tBudgetForecast
Analysis reportFrom the analystTo the managementOxygen, TAN and gill scoresAnswers from AskKey figures · Department 1The effect of the plan
The managing director opens the site's KPI dashboard.
The managing director gets the deviation report from the production manager.
The managing director gets the updated plan from the production manager.
The managing director gets the analyst's report.
Key figuresDepartment 1 against the rest of the facility1.151.00FCR1.321.50SGR (%)0.740.55Mortality (%)Department 1Rest of the facilityAnalysis reportTo the managing directorOxygen, TAN and feed against gill scoreAnswers from AskKey figures · Department 1The effect of the planSend
The analyst makes the report for the managing director.
Comes in automatically
Control systemOxygen · TGP · Redox · pH · Temperature · Level · Ozone · CO₂ · Flow · Pressure
FeedingConsumption · Type · Stock
GradingCount · Weight · Deviation
EnergyConsumption · kW
Camera systemBehaviour · Appetite
Water useFlow · Volume
TherynAppetiteFish healthBiofilterO₂ and pHWeighingReportTo-doQuestionQuestionPlanDeviationReport
06:00
A day at the facility.
The facility's systems send data to Theryn automatically, around the clock.
The whole day registered where the work is done, and gathered in Theryn.